Project | Av | Pf | FTQ | OEE |
---|---|---|---|---|
% | % | % | % | |
HIBISCUS | 96% | 56% | 79% | 77% |
ROSMARI | 79% | 63% | 98% | 80% |
Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||||
---|---|---|---|---|---|---|---|---|---|
Planned | Unplanned | ||||||||
Hrs | Hrs | % | Hrs | % | Hrs | Hrs | % | % | |
HIBISCUS | 48.00 | 0.50 | 1% | 1.75 | 4% | 47.50 | 45.75 | 95% | 96% |
ROSMARI | 636.00 | 70.57 | 11% | 136.67 | 21% | 565.43 | 428.77 | 67% | 79% |
684.00 | 71.07 | 10% | 138.42 | 20% | 612.93 | 474.52 | 69% | 80% |
Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|
% | |||||
HIBISCUS | 25 | 11 | 2 | 14 | 56% |
ROSMARI | 6760 | 4130 | 99 | 4235 | 63% |
6785 | 4141 | 101 | 4249 | 63% |
Project | ACC | REJ | Prd | FTQ |
---|---|---|---|---|
% | ||||
HIBISCUS | 11 | 2 | 14 | 79% |
ROSMARI | 4130 | 99 | 4235 | 98% |
8282 | 202 | 8498 | 97% |
Revenue | MYR | 43,805,240.31 | |
CoPQ | MYR | 1,843,945.72 | |
CoC | Trial | MYR | 124,627.26 |
Partly Coated | MYR | 348,594.94 |
Project | Revenue | CoPQ | CoC |
---|---|---|---|
MYR | MYR | MYR | |
ROSMARI | 41,650,950.55 | 1,595,835.09 | 347,127.77 |
HIBISCUS | 12,173.11 | 248,110.62 | 126,094.43 |
41,663,123.66 | 1,843,945.72 | 473,222.19 |
Project | Year 2023 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Av | ||||||||||||
Pf | |||||||||||||
FTQ | |||||||||||||
OEE | |||||||||||||
BAROSSA SURF
BAROSSA PROJECT SURF T&I
|
Av | 87% | 96% | 93% | |||||||||
Pf | 56% | 83% | 89% | ||||||||||
FTQ | 98% | 92% | 98% | ||||||||||
OEE | 80% | 90% | 94% | ||||||||||
JERUN
SK408W JERUN FIELD DEVELOPMENT PROJECT
|
Av | 81% | |||||||||||
Pf | 84% | ||||||||||||
FTQ | 99% | ||||||||||||
OEE | 88% | ||||||||||||
STATPIPE
STATPIPE NEW LANDFALL
|
Av | 90% | 92% | 91% | |||||||||
Pf | 18% | 35% | 29% | ||||||||||
FTQ | 73% | 97% | 100% | ||||||||||
OEE | 60% | 75% | 73% | ||||||||||
JULIET KLIA2
ENGINEERING,PROCUREMENT,CONSTRUCTION AND COMMISSIONING ("EPCC") FOR PIPELINE REPLACEMENT AND OTHER ASSOCIATED WORKS FROM VALVE CHAMBER VC-101 TO VC-102 AT KLIA2
|
Av | ||||||||||||
Pf | 36% | ||||||||||||
FTQ | 100% | ||||||||||||
OEE | 45% | ||||||||||||
NFXP
NORTH FIELD EXPANSION PROJECT(NFXP)
|
Av | 86% | 89% | 86% | 86% | ||||||||
Pf | 35% | 100% | 100% | 94% | 65% | ||||||||
FTQ | 44% | 98% | 99% | 96% | 99% | ||||||||
OEE | 27% | 97% | 98% | 92% | 84% | ||||||||
BEKOK
PROVISION OF PROCUREMENT, CONSTRUCTION & COMMISSIONING (PCC) OF MODULE 9 & PIPELINE FOR INTEGRATED BEKOK OIL PROJECT
|
Av | 86% | 50% | ||||||||||
Pf | 75% | 68% | |||||||||||
FTQ | 76% | 93% | |||||||||||
OEE | 79% | 70% | |||||||||||
ROSMARI
ROSMARI MARJORAM FIELD DEVELOPMENT
|
Av | 76% | |||||||||||
Pf | 45% | 63% | |||||||||||
FTQ | 84% | 98% | |||||||||||
OEE | 43% | 79% | |||||||||||
SHELL FAS
MLNG FAS (F27, F22 AND SELASIH) GAS FIELDS DEVELOPMENT
|
Av | 86% | |||||||||||
Pf | 33% | ||||||||||||
FTQ | 95% | ||||||||||||
OEE | 71% | ||||||||||||
PCSB GANSAR
PM 6 & 12 GAS GANSAR PROJECT
|
Av | 92% | |||||||||||
Pf | 93% | ||||||||||||
FTQ | 89% | ||||||||||||
OEE | 92% | ||||||||||||
HIBISCUS
PO20049 : Procuring Materials For BKABKC10PL Spool Repair.
|
Av | 96% | |||||||||||
Pf | 52% | ||||||||||||
FTQ | 85% | ||||||||||||
OEE | 78% | ||||||||||||
Av | 81% | 96% | 94% | 86% | 83% | 87% | 92% | 77% | |||||
Pf | 74% | 81% | 87% | 100% | 88% | 72% | 56% | 63% | |||||
FTQ | 99% | 92% | 97% | 98% | 98% | 97% | 96% | 98% | |||||
OEE | 84% | 90% | 93% | 94% | 89% | 85% | 81% | 79% |
Project | Year 2023 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Revenue | 164,831.98 | 345,332.59 | 18,757.91 | 501,798.56 | 571,051.95 | 190,075.74 | 217,478.34 | 988,677.11 | 1,392,892.25 | 584,455.32 | ||
CoPQ | |||||||||||||
CoC | |||||||||||||
BAROSSA SURF
BAROSSA PROJECT SURF T&I
|
Revenue | 1,168,102.90 | 12,907,415.38 | 2,085,703.42 | 3,572,618.98 | 1,283,852.72 | 990,045.80 | 1,334,360.65 | 3,790.99 | 424,534.84 | 0.26 | 2,474,602.79 | |
CoPQ | 36,080.29 | 358,620.15 | 134,830.94 | ||||||||||
CoC | 92,242.12 | 179,521.70 | 140,960.63 | 50,562.63 | |||||||||
JERUN
SK408W JERUN FIELD DEVELOPMENT PROJECT
|
Revenue | 37,144,206.88 | 569.39 | 426,570.85 | 35,163.56 | 1,508,894.69 | 1,728,280.55 | ||||||
CoPQ | 658,662.95 | ||||||||||||
CoC | |||||||||||||
STATPIPE
STATPIPE NEW LANDFALL
|
Revenue | 2,287,495.07 | 1,071,688.33 | 703,538.01 | 3,456,197.40 | 2,607,773.95 | 303,154.97 | 6,505.68 | |||||
CoPQ | 239,656.13 | 214,738.40 | |||||||||||
CoC | 87,065.42 | 58,389.45 | 645,903.48 | ||||||||||
JULIET KLIA2
ENGINEERING,PROCUREMENT,CONSTRUCTION AND COMMISSIONING ("EPCC") FOR PIPELINE REPLACEMENT AND OTHER ASSOCIATED WORKS FROM VALVE CHAMBER VC-101 TO VC-102 AT KLIA2
|
Revenue | 910,200.00 | |||||||||||
CoPQ | |||||||||||||
CoC | |||||||||||||
NFXP
NORTH FIELD EXPANSION PROJECT(NFXP)
|
Revenue | 397,802.43 | 577,205.75 | 6,730,299.61 | 8,613,228.88 | 8,063,173.26 | 1,409,506.52 | 158,871.25 | 6,978,151.50 | ||||
CoPQ | 25,194.95 | 330,651.27 | 206,738.35 | 569,297.12 | 8,417.10 | ||||||||
CoC | 37,777.91 | 187,772.69 | 124,447.00 | 342,675.63 | 116,949.78 | ||||||||
BEKOK
PROVISION OF PROCUREMENT, CONSTRUCTION & COMMISSIONING (PCC) OF MODULE 9 & PIPELINE FOR INTEGRATED BEKOK OIL PROJECT
|
Revenue | 72,629.10 | 426,451.08 | 3,901,777.52 | 40,714.81 | 79,976.21 | 156,653.13 | 97,364.06 | 16,637.06 | ||||
CoPQ | 166,544.27 | 1,372,245.26 | |||||||||||
CoC | 282,528.78 | 396,143.36 | |||||||||||
ROSMARI
ROSMARI MARJORAM FIELD DEVELOPMENT
|
Revenue | 548,764.49 | 2,991,488.75 | 41,650,950.55 | 58,202,785.84 | 17,759,772.78 | 64,423,965.36 | ||||||
CoPQ | 181,037.40 | 1,595,835.09 | |||||||||||
CoC | 261,499.15 | 374,016.10 | 347,127.77 | ||||||||||
SHELL FAS
MLNG FAS (F27, F22 AND SELASIH) GAS FIELDS DEVELOPMENT
|
Revenue | 3,920.74 | 244,669.18 | 512,431.99 | 615,938.65 | 11,665,248.10 | 702,598.18 | ||||||
CoPQ | 15,644.22 | ||||||||||||
CoC | 65,277.57 | ||||||||||||
PCSB GANSAR
PM 6 & 12 GAS GANSAR PROJECT
|
Revenue | 97,923.38 | 163,230.84 | 353,576.63 | 130,545.53 | 6,522,936.28 | 4,511,559.01 | ||||||
CoPQ | 5,107.05 | ||||||||||||
CoC | 51,187.95 | ||||||||||||
HIBISCUS
PO20049 : Procuring Materials For BKABKC10PL Spool Repair.
|
Revenue | 12,173.11 | 2,926,944.41 | 267,907.60 | |||||||||
CoPQ | 248,110.62 | ||||||||||||
CoC | 126,094.43 | ||||||||||||
Revenue | 38,477,141.76 | 13,253,317.36 | 6,126,529.68 | 5,831,104.28 | 9,144,141.42 | 18,470,144.29 | 14,995,963.78 | 5,082,738.23 | 43,789,824.81 | 69,940,407.36 | 37,631,899.75 | 72,697,180.66 | |
CoPQ | 694,743.23 | 358,620.15 | 160,025.89 | 736,851.67 | 1,793,722.02 | 569,297.12 | 210,205.77 | 1,843,945.72 | |||||
CoC | 92,242.12 | 179,521.70 | 265,803.96 | 528,690.92 | 1,166,493.85 | 654,737.41 | 607,431.41 | 473,222.19 |
Date | Plant | Wrk Hours | Downtime | Prd Hours | Uptime | Availability | |
---|---|---|---|---|---|---|---|
Planned | Unplanned | % | |||||
11/09/2023 | PLANT 3 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
11/09/2023 | PLANT 5 | 12:00 | 00:30 | 06:31 | 11:30 | 04:59 | 43% |
12/09/2023 | PLANT 3 | 12:00 | 00:30 | 02:35 | 11:30 | 08:55 | 78% |
12/09/2023 | PLANT 5 | 12:00 | 00:30 | 07:54 | 11:30 | 03:36 | 31% |
13/09/2023 | PLANT 3 | 12:00 | 00:30 | 02:15 | 11:30 | 09:15 | 80% |
13/09/2023 | PLANT 5 | 12:00 | 00:30 | 04:24 | 11:30 | 07:06 | 62% |
14/09/2023 | PLANT 3 | 12:00 | 00:30 | 04:50 | 11:30 | 06:40 | 58% |
14/09/2023 | PLANT 5 | 12:00 | 00:30 | 06:30 | 11:30 | 05:00 | 43% |
15/09/2023 | PLANT 3 | 12:00 | 02:50 | 00:50 | 09:10 | 08:20 | 91% |
15/09/2023 | PLANT 5 | 12:00 | 02:30 | 04:10 | 09:30 | 05:20 | 56% |
18/09/2023 | PLANT 2 (Ext) | 12:00 | 00:30 | 02:45 | 11:30 | 08:45 | 76% |
18/09/2023 | PLANT 3 | 24:00 | 05:00 | 01:49 | 19:00 | 17:11 | 90% |
18/09/2023 | PLANT 5 | 12:00 | 00:30 | 04:00 | 11:30 | 07:30 | 65% |
19/09/2023 | PLANT 2 (Ext) | 24:00 | 00:15 | 03:44 | 23:45 | 20:01 | 84% |
19/09/2023 | PLANT 3 | 24:00 | 03:00 | 03:22 | 21:00 | 17:38 | 84% |
19/09/2023 | PLANT 5 | 12:00 | 00:30 | 00:41 | 11:30 | 10:49 | 94% |
20/09/2023 | PLANT 2 (Ext) | 24:00 | 00:30 | 06:47 | 23:30 | 16:43 | 71% |
20/09/2023 | PLANT 3 | 24:00 | 04:19 | 03:33 | 19:41 | 16:08 | 82% |
20/09/2023 | PLANT 5 | 12:00 | 00:30 | 01:31 | 11:30 | 09:59 | 87% |
21/09/2023 | PLANT 2 (Ext) | 24:00 | 00:30 | 04:00 | 23:30 | 19:30 | 83% |
21/09/2023 | PLANT 3 | 24:00 | 03:00 | 11:50 | 21:00 | 09:10 | 44% |
21/09/2023 | PLANT 5 | 12:00 | 00:30 | 01:17 | 11:30 | 10:13 | 89% |
22/09/2023 | PLANT 3 | 24:00 | 02:30 | 02:45 | 21:30 | 18:45 | 87% |
22/09/2023 | PLANT 5 | 12:00 | 02:30 | 07:58 | 09:30 | 01:32 | 16% |
23/09/2023 | PLANT 3 | 24:00 | 05:00 | 00:51 | 19:00 | 18:09 | 96% |
23/09/2023 | PLANT 5 | 12:00 | 00:30 | 01:16 | 11:30 | 10:14 | 89% |
24/09/2023 | PLANT 3 | 24:00 | 04:50 | 01:35 | 19:10 | 17:35 | 92% |
24/09/2023 | PLANT 5 | 12:00 | 00:30 | 02:23 | 11:30 | 09:07 | 79% |
25/09/2023 | PLANT 3 | 24:00 | 05:45 | 03:55 | 18:15 | 14:20 | 79% |
25/09/2023 | PLANT 5 | 12:00 | 00:30 | 02:52 | 11:30 | 08:38 | 75% |
26/09/2023 | PLANT 3 | 24:00 | 04:15 | 01:08 | 19:45 | 18:37 | 94% |
26/09/2023 | PLANT 5 | 12:00 | 00:30 | 02:20 | 11:30 | 09:10 | 80% |
27/09/2023 | PLANT 3 | 24:00 | 02:45 | 02:14 | 21:15 | 19:01 | 89% |
27/09/2023 | PLANT 5 | 12:00 | 00:30 | 01:21 | 11:30 | 10:09 | 88% |
29/09/2023 | PLANT 2 (Ext) | 48:00 | 00:30 | 01:45 | 47:30 | 45:45 | 96% |
29/09/2023 | PLANT 3 | 24:00 | 06:45 | 06:22 | 17:15 | 10:53 | 63% |
29/09/2023 | PLANT 5 | 12:00 | 02:40 | 01:52 | 09:20 | 07:28 | 80% |
30/09/2023 | PLANT 3 | 24:00 | 02:40 | 07:53 | 21:20 | 13:27 | 63% |
30/09/2023 | PLANT 5 | 12:00 | 00:30 | 04:37 | 11:30 | 06:53 | 60% |
684:00 | 71:04 | 138:25 | 612:56 | 474:31 | 60% |
Date | Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|---|
% | ||||||
11/09/2023 | ROSMARI | 310 | 99 | 15 | 114 | 37% |
12/09/2023 | ROSMARI | 310 | 71 | 7 | 78 | 25% |
13/09/2023 | ROSMARI | 280 | 170 | 10 | 180 | 64% |
14/09/2023 | ROSMARI | 300 | 119 | 2 | 121 | 40% |
15/09/2023 | ROSMARI | 300 | 151 | 2 | 153 | 51% |
18/09/2023 | ROSMARI | 445 | 265 | 11 | 276 | 62% |
19/09/2023 | ROSMARI | 460 | 343 | 12 | 355 | 77% |
20/09/2023 | ROSMARI | 460 | 323 | 11 | 334 | 73% |
21/09/2023 | ROSMARI | 465 | 283 | 7 | 290 | 62% |
22/09/2023 | ROSMARI | 420 | 105 | 1 | 106 | 25% |
23/09/2023 | ROSMARI | 430 | 357 | 3 | 360 | 84% |
24/09/2023 | ROSMARI | 430 | 322 | 6 | 328 | 76% |
25/09/2023 | ROSMARI | 430 | 295 | 5 | 300 | 70% |
26/09/2023 | ROSMARI | 430 | 356 | 2 | 358 | 83% |
27/09/2023 | ROSMARI | 430 | 378 | 0 | 378 | 88% |
29/09/2023 | ROSMARI | 430 | 240 | 3 | 243 | 57% |
29/09/2023 | HIBISCUS | 25 | 11 | 2 | 13 | 52% |
30/09/2023 | ROSMARI | 430 | 253 | 2 | 255 | 59% |
Date | Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||
---|---|---|---|---|---|---|---|---|
Planned | Unplanned | |||||||
Hrs | Hrs | Hrs | % | Hrs | Hrs | % | ||
11/09/2023 | ROSMARI | 24:00 | 00:30 | 06:31 | 28% | 23:30 | 16:59 | 72% |
12/09/2023 | ROSMARI | 24:00 | 01:00 | 10:29 | 46% | 23:00 | 12:31 | 54% |
13/09/2023 | ROSMARI | 24:00 | 01:00 | 06:39 | 29% | 23:00 | 16:21 | 71% |
14/09/2023 | ROSMARI | 24:00 | 01:00 | 11:20 | 49% | 23:00 | 11:40 | 51% |
15/09/2023 | ROSMARI | 24:00 | 05:20 | 05:00 | 27% | 18:40 | 13:40 | 73% |
18/09/2023 | ROSMARI | 48:00 | 06:00 | 08:34 | 20% | 42:00 | 33:26 | 80% |
19/09/2023 | ROSMARI | 60:00 | 03:45 | 07:47 | 14% | 56:15 | 48:28 | 86% |
20/09/2023 | ROSMARI | 60:00 | 05:19 | 11:51 | 22% | 54:41 | 42:50 | 78% |
21/09/2023 | ROSMARI | 60:00 | 04:00 | 17:07 | 31% | 56:00 | 38:53 | 69% |
22/09/2023 | ROSMARI | 36:00 | 05:00 | 10:43 | 35% | 31:00 | 20:17 | 65% |
23/09/2023 | ROSMARI | 36:00 | 05:30 | 02:07 | 7% | 30:30 | 28:23 | 93% |
24/09/2023 | ROSMARI | 36:00 | 05:20 | 03:58 | 13% | 30:40 | 26:42 | 87% |
25/09/2023 | ROSMARI | 36:00 | 06:15 | 06:47 | 23% | 29:45 | 22:58 | 77% |
26/09/2023 | ROSMARI | 36:00 | 04:45 | 03:28 | 11% | 31:15 | 27:47 | 89% |
27/09/2023 | ROSMARI | 36:00 | 03:15 | 03:35 | 11% | 32:45 | 29:10 | 89% |
29/09/2023 | ROSMARI | 36:00 | 09:25 | 08:14 | 31% | 26:35 | 18:21 | 69% |
29/09/2023 | HIBISCUS | 48:00 | 00:30 | 01:45 | 4% | 47:30 | 45:45 | 96% |
30/09/2023 | ROSMARI | 36:00 | 03:10 | 12:30 | 38% | 32:50 | 20:20 | 62% |
684:00 | 71:04 | 138:25 | 23% | 612:56 | 474:31 | 77% |
Date | Project | ACC | REJ | PC | Prd | FTQ |
---|---|---|---|---|---|---|
% | ||||||
11/09/2023 | ROSMARI | 99 | 15 | 0 | 114 | 87% |
12/09/2023 | ROSMARI | 71 | 7 | 0 | 78 | 91% |
13/09/2023 | ROSMARI | 170 | 10 | 0 | 180 | 94% |
14/09/2023 | ROSMARI | 119 | 2 | 0 | 121 | 98% |
15/09/2023 | ROSMARI | 151 | 2 | 0 | 153 | 99% |
18/09/2023 | ROSMARI | 265 | 11 | 1 | 277 | 96% |
19/09/2023 | ROSMARI | 343 | 12 | 2 | 357 | 96% |
20/09/2023 | ROSMARI | 323 | 11 | 1 | 335 | 96% |
21/09/2023 | ROSMARI | 283 | 7 | 2 | 292 | 97% |
22/09/2023 | ROSMARI | 105 | 1 | 0 | 106 | 99% |
23/09/2023 | ROSMARI | 357 | 3 | 0 | 360 | 99% |
24/09/2023 | ROSMARI | 322 | 6 | 0 | 328 | 98% |
25/09/2023 | ROSMARI | 295 | 5 | 0 | 300 | 98% |
26/09/2023 | ROSMARI | 356 | 2 | 0 | 358 | 99% |
27/09/2023 | ROSMARI | 378 | 0 | 0 | 378 | 100% |
29/09/2023 | ROSMARI | 240 | 3 | 0 | 243 | 99% |
29/09/2023 | HIBISCUS | 11 | 2 | 1 | 14 | 79% |
30/09/2023 | ROSMARI | 253 | 2 | 0 | 255 | 99% |
4141 | 101 | 7 | 4249 | 97% |