Project | Av | Pf | FTQ | OEE |
---|---|---|---|---|
% | % | % | % | |
BAROSSA GEP | 81% | 59% | 90% | 77% |
KASAWARI | 77% | 42% | 99% | 73% |
NMB4A - Main Lot | 100% | 100% | 80% | 93% |
WEST TANK | 19% | 108% | 92% | 73% |
Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||||
---|---|---|---|---|---|---|---|---|---|
Planned | Unplanned | ||||||||
Hrs | Hrs | % | Hrs | % | Hrs | Hrs | % | % | |
BAROSSA GEP | 280.00 | 16.25 | 6% | 51.98 | 19% | 263.75 | 211.77 | 76% | 81% |
KASAWARI | 217.00 | 12.67 | 6% | 50.68 | 23% | 204.33 | 153.65 | 71% | 77% |
NMB4A - Main Lot | 10.00 | 10.00 | 10.00 | 100% | 100% | ||||
WEST TANK | 12.00 | 0.50 | 4% | 9.75 | 81% | 11.50 | 1.75 | 15% | 19% |
519.00 | 29.42 | 6% | 112.42 | 22% | 489.58 | 377.17 | 73% | 78% |
Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|
% | |||||
BAROSSA GEP | 2144 | 1148 | 125 | 1273 | 59% |
KASAWARI | 4222 | 1769 | 14 | 1791 | 42% |
NMB4A - Main Lot | 5 | 4 | 1 | 5 | 100% |
WEST TANK | 12 | 12 | 0 | 13 | 108% |
6383 | 2933 | 140 | 3082 | 48% |
Project | ACC | REJ | Prd | FTQ |
---|---|---|---|---|
% | ||||
BAROSSA GEP | 1148 | 125 | 1273 | 90% |
KASAWARI | 1769 | 14 | 1791 | 99% |
NMB4A - Main Lot | 4 | 1 | 5 | 80% |
WEST TANK | 12 | 0 | 13 | 92% |
5866 | 280 | 6164 | 95% |
Revenue | MYR | 9,319,684.00 | |
CoPQ | MYR | 321,543.30 | |
CoC | Trial | MYR | 83,710.44 |
Partly Coated | MYR | 134,752.13 |
Project | Revenue | CoPQ | CoC |
---|---|---|---|
MYR | MYR | MYR | |
BAROSSA GEP | 0.00 | 199,184.72 | 0.00 |
KASAWARI | 0.00 | 80,041.97 | 139,378.32 |
WEST TANK | 0.00 | 0.00 | 73,133.04 |
NMB4A - Main Lot | 0.00 | 42,316.62 | 5,951.21 |
0.00 | 321,543.30 | 218,462.57 |
Project | Year 2022 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Av | 74% | 76% | ||||||||||
Pf | 9% | 51% | |||||||||||
FTQ | 97% | 90% | |||||||||||
OEE | 60% | 73% | |||||||||||
KASAWARI
PROVISION OF LINEPIPE COATING SERVICES FOR KASAWARI GAS DEVELOPMENT PROJECT
|
Av | 85% | 81% | 70% | |||||||||
Pf | 57% | 37% | 36% | ||||||||||
FTQ | 100% | 99% | 99% | ||||||||||
OEE | 81% | 72% | 69% | ||||||||||
WEST TANK
WEST TANK GROUP DECOMPEXING
|
Av | 15% | |||||||||||
Pf | 100% | ||||||||||||
FTQ | 100% | ||||||||||||
OEE | 72% | ||||||||||||
NMB4A - Main Lot
NORTH MALAY BASIN PHASE 4A MAIN LOT FACILITIES CONTRACT
|
Av | 66% | |||||||||||
Pf | 92% | 55% | |||||||||||
FTQ | 100% | 36% | |||||||||||
OEE | 86% | 29% | |||||||||||
Av | 85% | 79% | 71% | ||||||||||
Pf | 57% | 34% | 41% | ||||||||||
FTQ | 100% | 99% | 95% | ||||||||||
OEE | 81% | 71% | 69% |
Project | Year 2022 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Revenue | ||||||||||||
CoPQ | 1,867.03 | 199,184.72 | |||||||||||
CoC | 30,635.26 | 2,800.16 | |||||||||||
KASAWARI
PROVISION OF LINEPIPE COATING SERVICES FOR KASAWARI GAS DEVELOPMENT PROJECT
|
Revenue | ||||||||||||
CoPQ | 71,294.57 | 141,462.93 | 80,041.97 | ||||||||||
CoC | 139,378.32 | ||||||||||||
WEST TANK
WEST TANK GROUP DECOMPEXING
|
Revenue | ||||||||||||
CoPQ | |||||||||||||
CoC | 73,133.04 | ||||||||||||
NMB4A - Main Lot
NORTH MALAY BASIN PHASE 4A MAIN LOT FACILITIES CONTRACT
|
Revenue | ||||||||||||
CoPQ | 42,316.62 | ||||||||||||
CoC | 11,429.43 | 5,951.21 | |||||||||||
Revenue | |||||||||||||
CoPQ | 71,294.57 | 143,329.95 | 321,543.30 | ||||||||||
CoC | 30,635.26 | 14,229.59 | 218,462.57 |
Date | Plant | Wrk Hours | Downtime | Prd Hours | Uptime | Availability | |
---|---|---|---|---|---|---|---|
Planned | Unplanned | % | |||||
01/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 00:35 | 10:30 | 09:55 | 94% |
02/03/2022 | PLANT 2 (Ext) | 12:00 | 00:30 | 09:45 | 11:30 | 01:45 | 15% |
02/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 02:05 | 10:30 | 08:25 | 80% |
03/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 00:35 | 10:30 | 09:55 | 94% |
08/03/2022 | PLANT 2 (Int) | 24:00 | 00:30 | 01:05 | 23:30 | 22:25 | 95% |
10/03/2022 | PLANT 2 (Int) | 12:00 | 00:30 | 02:15 | 11:30 | 09:15 | 80% |
11/03/2022 | PLANT 2 (Int) | 24:00 | 00:30 | 03:15 | 23:30 | 20:15 | 86% |
11/03/2022 | PLANT 5 | 10:00 | 02:30 | 08:50 | 07:30 | Error | No data |
14/03/2022 | PLANT 2 (Int) | 23:00 | 01:15 | 00:30 | 21:45 | 21:15 | 98% |
15/03/2022 | PLANT 2 (Ext) | 11:00 | 02:00 | 06:15 | 09:00 | 02:45 | 31% |
15/03/2022 | PLANT 2 (Int) | 11:00 | 01:30 | 03:30 | 09:30 | 06:00 | 63% |
16/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 01:10 | 10:30 | 09:20 | 89% |
17/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 00:40 | 10:30 | 09:50 | 94% |
18/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 00:20 | 10:30 | 10:10 | 97% |
21/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 01:08 | 10:30 | 09:22 | 89% |
22/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 01:21 | 10:30 | 09:09 | 87% |
22/03/2022 | PLANT 3 | 10:00 | No data | No data | 10:00 | 10:00 | 100% |
23/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 00:16 | 10:30 | 10:14 | 97% |
24/03/2022 | PLANT 2 (Ext) | 12:00 | 02:10 | 05:30 | 09:50 | 04:20 | 44% |
24/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 07:44 | 10:30 | 02:46 | 26% |
24/03/2022 | PLANT 3 | 12:00 | 00:15 | 08:15 | 11:45 | 03:30 | 30% |
24/03/2022 | PLANT 5 | 12:00 | 00:30 | 03:45 | 11:30 | 07:45 | 67% |
25/03/2022 | PLANT 2 (Ext) | 12:00 | 00:30 | 00:15 | 11:30 | 11:15 | 98% |
25/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 01:32 | 10:30 | 08:58 | 85% |
25/03/2022 | PLANT 3 | 12:00 | 00:15 | 01:15 | 11:45 | 10:30 | 89% |
25/03/2022 | PLANT 5 | 12:00 | 02:45 | 01:35 | 09:15 | 07:40 | 83% |
28/03/2022 | PLANT 2 (Ext) | 12:00 | 01:00 | 08:45 | 11:00 | 02:15 | 20% |
28/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 02:12 | 10:30 | 08:18 | 79% |
28/03/2022 | PLANT 3 | 12:00 | 01:40 | 01:53 | 10:20 | 08:27 | 82% |
28/03/2022 | PLANT 5 | 13:00 | 00:30 | 09:00 | 12:30 | 03:30 | 28% |
29/03/2022 | PLANT 2 (Ext) | 12:00 | 00:40 | 00:20 | 11:20 | 11:00 | 97% |
29/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 02:35 | 10:30 | 07:55 | 75% |
29/03/2022 | PLANT 3 | 12:00 | 00:15 | 05:54 | 11:45 | 05:51 | 50% |
29/03/2022 | PLANT 5 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
30/03/2022 | PLANT 2 (Ext) | 12:00 | 00:35 | 00:15 | 11:25 | 11:10 | 98% |
30/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 01:20 | 10:30 | 09:10 | 87% |
30/03/2022 | PLANT 3 | 12:00 | 00:15 | 00:45 | 11:45 | 11:00 | 94% |
30/03/2022 | PLANT 5 | 12:00 | 00:30 | 01:45 | 11:30 | 09:45 | 85% |
31/03/2022 | PLANT 2 (Ext) | 12:00 | 00:35 | No data | 11:25 | 11:25 | 100% |
31/03/2022 | PLANT 2 (Int) | 11:00 | 00:30 | 02:46 | 10:30 | 07:44 | 74% |
31/03/2022 | PLANT 3 | 12:00 | 00:15 | 01:29 | 11:45 | 10:16 | 87% |
31/03/2022 | PLANT 5 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
519:00 | 29:25 | 112:25 | 489:35 | 377:10 | 100% |
Date | Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|---|
% | ||||||
01/03/2022 | BAROSSA GEP | 30 | 75 | 2 | 77 | 257% |
02/03/2022 | BAROSSA GEP | 100 | 72 | 2 | 74 | 74% |
02/03/2022 | WEST TANK | 12 | 12 | 0 | 12 | 100% |
03/03/2022 | BAROSSA GEP | 100 | 81 | 2 | 83 | 83% |
08/03/2022 | BAROSSA GEP | 220 | 0 | 24 | 24 | 11% |
10/03/2022 | BAROSSA GEP | 50 | 5 | 1 | 6 | 12% |
11/03/2022 | BAROSSA GEP | 35 | 22 | 3 | 25 | 71% |
14/03/2022 | BAROSSA GEP | 60 | 48 | 5 | 53 | 88% |
15/03/2022 | BAROSSA GEP | 59 | 42 | 9 | 51 | 86% |
16/03/2022 | BAROSSA GEP | 50 | 69 | 0 | 69 | 138% |
17/03/2022 | BAROSSA GEP | 50 | 74 | 1 | 75 | 150% |
18/03/2022 | BAROSSA GEP | 50 | 69 | 0 | 69 | 138% |
21/03/2022 | BAROSSA GEP | 100 | 73 | 3 | 76 | 76% |
22/03/2022 | BAROSSA GEP | 100 | 82 | 0 | 82 | 82% |
22/03/2022 | NMB4A - Main Lot | 5 | 4 | 1 | 5 | 100% |
23/03/2022 | BAROSSA GEP | 180 | 81 | 2 | 83 | 46% |
24/03/2022 | BAROSSA GEP | 180 | 34 | 0 | 34 | 19% |
24/03/2022 | KASAWARI | 560 | 202 | 2 | 204 | 36% |
25/03/2022 | BAROSSA GEP | 180 | 72 | 2 | 74 | 41% |
25/03/2022 | KASAWARI | 580 | 313 | 5 | 318 | 55% |
28/03/2022 | BAROSSA GEP | 150 | 58 | 24 | 82 | 55% |
28/03/2022 | KASAWARI | 902 | 163 | 0 | 163 | 18% |
29/03/2022 | BAROSSA GEP | 150 | 53 | 18 | 71 | 47% |
29/03/2022 | KASAWARI | 770 | 358 | 4 | 362 | 47% |
30/03/2022 | BAROSSA GEP | 150 | 76 | 14 | 90 | 60% |
30/03/2022 | KASAWARI | 510 | 487 | 2 | 489 | 96% |
31/03/2022 | BAROSSA GEP | 150 | 62 | 13 | 75 | 50% |
31/03/2022 | KASAWARI | 900 | 246 | 1 | 247 | 27% |
Date | Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||
---|---|---|---|---|---|---|---|---|
Planned | Unplanned | |||||||
Hrs | Hrs | Hrs | % | Hrs | Hrs | % | ||
01/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 00:35 | 6% | 10:30 | 09:55 | 94% |
02/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 02:05 | 20% | 10:30 | 08:25 | 80% |
02/03/2022 | WEST TANK | 12:00 | 00:30 | 09:45 | 85% | 11:30 | 01:45 | 15% |
03/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 00:35 | 6% | 10:30 | 09:55 | 94% |
08/03/2022 | BAROSSA GEP | 24:00 | 00:30 | 01:05 | 5% | 23:30 | 22:25 | 95% |
10/03/2022 | BAROSSA GEP | 12:00 | 00:30 | 02:15 | 20% | 11:30 | 09:15 | 80% |
11/03/2022 | BAROSSA GEP | 34:00 | 03:00 | 12:05 | 39% | 31:00 | 18:55 | 61% |
14/03/2022 | BAROSSA GEP | 23:00 | 01:15 | 00:30 | 2% | 21:45 | 21:15 | 98% |
15/03/2022 | BAROSSA GEP | 22:00 | 03:30 | 09:45 | 53% | 18:30 | 08:45 | 47% |
16/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 01:10 | 11% | 10:30 | 09:20 | 89% |
17/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 00:40 | 6% | 10:30 | 09:50 | 94% |
18/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 00:20 | 3% | 10:30 | 10:10 | 97% |
21/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 01:08 | 11% | 10:30 | 09:22 | 89% |
22/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 01:21 | 13% | 10:30 | 09:09 | 87% |
22/03/2022 | NMB4A - Main Lot | 10:00 | No data | No data | 10:00 | 10:00 | 100% | |
23/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 00:16 | 3% | 10:30 | 10:14 | 97% |
24/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 07:44 | 74% | 10:30 | 02:46 | 26% |
24/03/2022 | KASAWARI | 36:00 | 02:55 | 17:30 | 53% | 33:05 | 15:35 | 47% |
25/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 01:32 | 15% | 10:30 | 08:58 | 85% |
25/03/2022 | KASAWARI | 36:00 | 03:30 | 03:05 | 9% | 32:30 | 29:25 | 91% |
28/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 02:12 | 21% | 10:30 | 08:18 | 79% |
28/03/2022 | KASAWARI | 37:00 | 03:10 | 19:38 | 58% | 33:50 | 14:12 | 42% |
29/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 02:35 | 25% | 10:30 | 07:55 | 75% |
29/03/2022 | KASAWARI | 36:00 | 00:55 | 06:14 | 18% | 35:05 | 28:51 | 82% |
30/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 01:20 | 13% | 10:30 | 09:10 | 87% |
30/03/2022 | KASAWARI | 36:00 | 01:20 | 02:45 | 8% | 34:40 | 31:55 | 92% |
31/03/2022 | BAROSSA GEP | 11:00 | 00:30 | 02:46 | 26% | 10:30 | 07:44 | 74% |
31/03/2022 | KASAWARI | 36:00 | 00:50 | 01:29 | 4% | 35:10 | 33:41 | 96% |
519:00 | 29:25 | 112:25 | 23% | 489:35 | 377:10 | 77% |
Date | Project | ACC | REJ | PC | Prd | FTQ |
---|---|---|---|---|---|---|
% | ||||||
01/03/2022 | BAROSSA GEP | 75 | 2 | 0 | 77 | 97% |
02/03/2022 | BAROSSA GEP | 72 | 2 | 0 | 74 | 97% |
02/03/2022 | WEST TANK | 12 | 0 | 1 | 13 | 92% |
03/03/2022 | BAROSSA GEP | 81 | 2 | 0 | 83 | 98% |
08/03/2022 | BAROSSA GEP | 0 | 24 | 0 | 24 | |
10/03/2022 | BAROSSA GEP | 5 | 1 | 0 | 6 | 83% |
11/03/2022 | BAROSSA GEP | 22 | 3 | 0 | 25 | 88% |
14/03/2022 | BAROSSA GEP | 48 | 5 | 0 | 53 | 91% |
15/03/2022 | BAROSSA GEP | 42 | 9 | 0 | 51 | 82% |
16/03/2022 | BAROSSA GEP | 69 | 0 | 0 | 69 | 100% |
17/03/2022 | BAROSSA GEP | 74 | 1 | 0 | 75 | 99% |
18/03/2022 | BAROSSA GEP | 69 | 0 | 0 | 69 | 100% |
21/03/2022 | BAROSSA GEP | 73 | 3 | 0 | 76 | 96% |
22/03/2022 | BAROSSA GEP | 82 | 0 | 0 | 82 | 100% |
22/03/2022 | NMB4A - Main Lot | 4 | 1 | 0 | 5 | 80% |
23/03/2022 | BAROSSA GEP | 81 | 2 | 0 | 83 | 98% |
24/03/2022 | BAROSSA GEP | 34 | 0 | 0 | 34 | 100% |
24/03/2022 | KASAWARI | 202 | 2 | 3 | 207 | 98% |
25/03/2022 | BAROSSA GEP | 72 | 2 | 0 | 74 | 97% |
25/03/2022 | KASAWARI | 313 | 5 | 1 | 319 | 98% |
28/03/2022 | BAROSSA GEP | 58 | 24 | 0 | 82 | 71% |
28/03/2022 | KASAWARI | 163 | 0 | 1 | 164 | 99% |
29/03/2022 | BAROSSA GEP | 53 | 18 | 0 | 71 | 75% |
29/03/2022 | KASAWARI | 358 | 4 | 1 | 363 | 99% |
30/03/2022 | BAROSSA GEP | 76 | 14 | 0 | 90 | 84% |
30/03/2022 | KASAWARI | 487 | 2 | 1 | 490 | 99% |
31/03/2022 | BAROSSA GEP | 62 | 13 | 0 | 75 | 83% |
31/03/2022 | KASAWARI | 246 | 1 | 1 | 248 | 99% |
2933 | 140 | 9 | 3082 | 95% |