Project | Av | Pf | FTQ | OEE |
---|---|---|---|---|
% | % | % | % | |
BAROSSA GEP | 85% | 69% | 97% | 84% |
NMB4A - Main Lot | 85% | 97% | 98% | 93% |
SHELL TIMI | 100% | 200% | 98% | 133% |
Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||||
---|---|---|---|---|---|---|---|---|---|
Planned | Unplanned | ||||||||
Hrs | Hrs | % | Hrs | % | Hrs | Hrs | % | % | |
BAROSSA GEP | 565.50 | 21.75 | 4% | 83.02 | 15% | 543.75 | 460.73 | 81% | 85% |
NMB4A - Main Lot | 300.50 | 24.27 | 8% | 43.85 | 15% | 276.23 | 232.38 | 77% | 85% |
SHELL TIMI | 12.00 | 12.00 | 12.00 | 100% | 100% | ||||
878.00 | 46.02 | 5% | 126.87 | 14% | 831.98 | 705.12 | 80% | 86% |
Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|
% | |||||
BAROSSA GEP | 5279 | 3523 | 103 | 3626 | 69% |
NMB4A - Main Lot | 3337 | 3164 | 9 | 3223 | 97% |
SHELL TIMI | 10 | 0 | 17 | 20 | 200% |
8626 | 6687 | 129 | 6869 | 80% |
Project | ACC | REJ | Prd | FTQ |
---|---|---|---|---|
% | ||||
BAROSSA GEP | 3523 | 103 | 3626 | 97% |
NMB4A - Main Lot | 3164 | 9 | 3223 | 98% |
SHELL TIMI | 0 | 17 | 20 | 0 |
13374 | 258 | 13738 | 97% |
Revenue | MYR | 15,596,435.00 | |
CoPQ | MYR | 611,231.19 | |
CoC | Trial | MYR | 36,480.27 |
Partly Coated | MYR | 364,180.78 |
Project | Revenue | CoPQ | CoC |
---|---|---|---|
MYR | MYR | MYR | |
BAROSSA GEP | 0.00 | 405,208.60 | 6,668.81 |
NMB4A - Main Lot | 0.00 | 101,336.16 | 347,173.17 |
SHELL TIMI | 0.00 | 104,686.43 | 46,819.07 |
0.00 | 611,231.19 | 400,661.05 |
Project | Year 2022 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Av | 74% | 76% | 70% | 85% | ||||||||
Pf | 9% | 51% | 49% | 69% | |||||||||
FTQ | 97% | 90% | 97% | 96% | |||||||||
OEE | 60% | 73% | 72% | 83% | |||||||||
KASAWARI
PROVISION OF LINEPIPE COATING SERVICES FOR KASAWARI GAS DEVELOPMENT PROJECT
|
Av | 85% | 81% | 70% | 78% | ||||||||
Pf | 57% | 37% | 36% | 23% | |||||||||
FTQ | 100% | 99% | 99% | 100% | |||||||||
OEE | 81% | 72% | 69% | 67% | |||||||||
PTTEP SIRIKIT
PTTEP UNDERGROUND LINE SIRIKIT OILFIELD
|
Av | 100% | |||||||||||
Pf | 100% | ||||||||||||
FTQ | 92% | ||||||||||||
OEE | 100% | ||||||||||||
WEST TANK
WEST TANK GROUP DECOMPEXING
|
Av | 15% | |||||||||||
Pf | 100% | ||||||||||||
FTQ | 100% | ||||||||||||
OEE | 72% | ||||||||||||
NMB4A - Main Lot
NORTH MALAY BASIN PHASE 4A MAIN LOT FACILITIES CONTRACT
|
Av | 66% | 79% | ||||||||||
Pf | 92% | 55% | 89% | ||||||||||
FTQ | 100% | 36% | 100% | ||||||||||
OEE | 86% | 29% | 89% | ||||||||||
SHELL TIMI
SK318 TIMI DEVELOPMENT PROJECT
|
Av | 13% | |||||||||||
Pf | 100% | ||||||||||||
FTQ | 51% | ||||||||||||
OEE | 62% | ||||||||||||
Av | 85% | 79% | 71% | 70% | 82% | ||||||||
Pf | 57% | 34% | 41% | 44% | 78% | ||||||||
FTQ | 100% | 99% | 95% | 97% | 98% | ||||||||
OEE | 81% | 71% | 69% | 70% | 86% |
Project | Year 2022 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Revenue | ||||||||||||
CoPQ | 1,867.03 | 199,184.72 | 925,397.93 | 405,208.60 | |||||||||
CoC | 30,635.26 | 2,800.16 | 6,668.81 | ||||||||||
KASAWARI
PROVISION OF LINEPIPE COATING SERVICES FOR KASAWARI GAS DEVELOPMENT PROJECT
|
Revenue | ||||||||||||
CoPQ | 71,294.57 | 141,462.93 | 80,041.97 | 8,924.53 | |||||||||
CoC | 139,378.32 | 34,857.46 | |||||||||||
PTTEP SIRIKIT
PTTEP UNDERGROUND LINE SIRIKIT OILFIELD
|
Revenue | ||||||||||||
CoPQ | 8,066.33 | ||||||||||||
CoC | 8,070.17 | ||||||||||||
WEST TANK
WEST TANK GROUP DECOMPEXING
|
Revenue | ||||||||||||
CoPQ | |||||||||||||
CoC | 73,133.04 | ||||||||||||
NMB4A - Main Lot
NORTH MALAY BASIN PHASE 4A MAIN LOT FACILITIES CONTRACT
|
Revenue | ||||||||||||
CoPQ | 42,316.62 | 101,336.16 | |||||||||||
CoC | 11,429.43 | 5,951.21 | 347,173.17 | ||||||||||
SHELL TIMI
SK318 TIMI DEVELOPMENT PROJECT
|
Revenue | ||||||||||||
CoPQ | 104,686.43 | ||||||||||||
CoC | 46,819.07 | ||||||||||||
Revenue | |||||||||||||
CoPQ | 71,294.57 | 143,329.95 | 321,543.30 | 942,388.79 | 611,231.19 | ||||||||
CoC | 30,635.26 | 14,229.59 | 218,462.57 | 42,927.63 | 400,661.05 |
Date | Plant | Wrk Hours | Downtime | Prd Hours | Uptime | Availability | |
---|---|---|---|---|---|---|---|
Planned | Unplanned | % | |||||
09/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 07:38 | 22:00 | 14:22 | 65% |
10/05/2022 | PLANT 2 (Ext) | 12:00 | 02:20 | 03:00 | 09:40 | 06:40 | 69% |
10/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 03:20 | 22:00 | 18:40 | 85% |
11/05/2022 | PLANT 2 (Ext) | 24:00 | 01:20 | 03:40 | 22:40 | 19:00 | 84% |
11/05/2022 | PLANT 2 (Int) | 23:00 | 00:45 | 00:27 | 22:15 | 21:48 | 98% |
12/05/2022 | PLANT 2 (Ext) | 32:00 | 00:50 | 06:24 | 31:10 | 24:46 | 79% |
12/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 03:18 | 22:00 | 18:42 | 85% |
13/05/2022 | PLANT 2 (Ext) | 26:00 | 02:40 | 01:00 | 23:20 | 22:20 | 96% |
13/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | No data | 22:00 | 22:00 | 100% |
14/05/2022 | PLANT 2 (Ext) | 23:00 | 01:05 | 02:10 | 21:55 | 19:45 | 90% |
14/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 01:22 | 22:00 | 20:38 | 94% |
16/05/2022 | PLANT 2 (Ext) | 23:00 | 01:12 | 00:22 | 21:48 | 21:26 | 98% |
16/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 00:48 | 22:00 | 21:12 | 96% |
17/05/2022 | PLANT 2 (Ext) | 22:30 | 01:50 | 02:52 | 20:40 | 17:48 | 86% |
17/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 01:20 | 22:00 | 20:40 | 94% |
18/05/2022 | PLANT 2 (Int) | 23:00 | 01:30 | 04:14 | 21:30 | 17:16 | 80% |
19/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 02:28 | 22:00 | 19:32 | 89% |
19/05/2022 | PLANT 5 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
20/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 02:31 | 22:00 | 19:29 | 89% |
21/05/2022 | PLANT 2 (Ext) | 22:00 | 01:30 | 07:47 | 20:30 | 12:43 | 62% |
21/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 02:24 | 22:00 | 19:36 | 89% |
21/05/2022 | PLANT 3 | 11:00 | No data | No data | 11:00 | 11:00 | 100% |
23/05/2022 | PLANT 2 (Ext) | 22:00 | 01:00 | 04:35 | 21:00 | 16:25 | 78% |
23/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 11:26 | 22:00 | 10:34 | 48% |
23/05/2022 | PLANT 3 | 11:00 | No data | No data | 11:00 | 11:00 | 100% |
23/05/2022 | PLANT 5 | 11:00 | No data | No data | 11:00 | 11:00 | 100% |
24/05/2022 | PLANT 2 (Ext) | 22:00 | 01:00 | 05:49 | 21:00 | 15:11 | 72% |
24/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 07:50 | 22:00 | 14:10 | 64% |
24/05/2022 | PLANT 5 | 12:00 | 00:30 | 07:25 | 11:30 | 04:05 | 36% |
25/05/2022 | PLANT 2 (Ext) | 11:00 | 03:29 | No data | 07:31 | 07:31 | 100% |
25/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 07:10 | 22:00 | 14:50 | 67% |
25/05/2022 | PLANT 3 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
26/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 01:32 | 22:00 | 20:28 | 93% |
27/05/2022 | PLANT 2 (Ext) | 41:30 | 00:30 | 06:12 | 41:00 | 34:48 | 85% |
27/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 01:43 | 22:00 | 20:17 | 92% |
27/05/2022 | PLANT 3 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
28/05/2022 | PLANT 2 (Ext) | 19:30 | 05:30 | No data | 14:00 | 14:00 | 100% |
28/05/2022 | PLANT 2 (Int) | 11:30 | 00:30 | 01:17 | 11:00 | 09:43 | 88% |
28/05/2022 | PLANT 5 | 12:00 | 00:30 | 09:00 | 11:30 | 02:30 | 22% |
30/05/2022 | PLANT 2 (Int) | 23:00 | 01:00 | 04:36 | 22:00 | 17:24 | 79% |
30/05/2022 | PLANT 3 | 24:00 | 00:30 | No data | 23:30 | 23:30 | 100% |
31/05/2022 | PLANT 2 (Ext) | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
31/05/2022 | PLANT 2 (Int) | 23:00 | 01:30 | 01:12 | 21:30 | 20:18 | 94% |
878:00 | 46:01 | 126:52 | 831:59 | 705:07 | 94% |
Date | Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|---|
% | ||||||
09/05/2022 | BAROSSA GEP | 200 | 138 | 1 | 139 | 70% |
10/05/2022 | BAROSSA GEP | 360 | 168 | 1 | 169 | 47% |
10/05/2022 | NMB4A - Main Lot | 10 | 6 | 1 | 7 | 70% |
11/05/2022 | BAROSSA GEP | 360 | 188 | 2 | 190 | 53% |
11/05/2022 | NMB4A - Main Lot | 300 | 327 | 2 | 329 | 110% |
12/05/2022 | BAROSSA GEP | 360 | 171 | 1 | 172 | 48% |
12/05/2022 | NMB4A - Main Lot | 300 | 260 | 1 | 261 | 87% |
13/05/2022 | BAROSSA GEP | 360 | 176 | 1 | 177 | 49% |
13/05/2022 | NMB4A - Main Lot | 300 | 328 | 0 | 328 | 109% |
14/05/2022 | BAROSSA GEP | 236 | 185 | 4 | 189 | 80% |
14/05/2022 | NMB4A - Main Lot | 360 | 353 | 0 | 353 | 98% |
16/05/2022 | BAROSSA GEP | 236 | 214 | 3 | 217 | 92% |
16/05/2022 | NMB4A - Main Lot | 360 | 378 | 0 | 378 | 105% |
17/05/2022 | BAROSSA GEP | 236 | 185 | 7 | 192 | 81% |
17/05/2022 | NMB4A - Main Lot | 360 | 325 | 3 | 328 | 91% |
18/05/2022 | BAROSSA GEP | 236 | 160 | 1 | 161 | 68% |
19/05/2022 | BAROSSA GEP | 362 | 195 | 33 | 228 | 63% |
20/05/2022 | BAROSSA GEP | 217 | 184 | 0 | 184 | 85% |
21/05/2022 | BAROSSA GEP | 251 | 203 | 4 | 207 | 82% |
21/05/2022 | NMB4A - Main Lot | 360 | 251 | 0 | 251 | 70% |
23/05/2022 | BAROSSA GEP | 258 | 115 | 4 | 119 | 46% |
23/05/2022 | NMB4A - Main Lot | 360 | 308 | 0 | 308 | 86% |
24/05/2022 | BAROSSA GEP | 256 | 148 | 9 | 157 | 61% |
24/05/2022 | NMB4A - Main Lot | 299 | 313 | 0 | 313 | 105% |
25/05/2022 | BAROSSA GEP | 250 | 170 | 6 | 176 | 70% |
25/05/2022 | NMB4A - Main Lot | 130 | 134 | 0 | 134 | 103% |
26/05/2022 | BAROSSA GEP | 236 | 213 | 1 | 214 | 91% |
27/05/2022 | BAROSSA GEP | 232 | 200 | 7 | 207 | 89% |
27/05/2022 | NMB4A - Main Lot | 131 | 145 | 2 | 147 | 112% |
28/05/2022 | BAROSSA GEP | 133 | 104 | 7 | 111 | 83% |
28/05/2022 | NMB4A - Main Lot | 67 | 36 | 0 | 36 | 54% |
30/05/2022 | BAROSSA GEP | 264 | 191 | 5 | 196 | 74% |
31/05/2022 | BAROSSA GEP | 236 | 215 | 6 | 221 | 94% |
31/05/2022 | SHELL TIMI | 10 | 0 | 17 | 17 | 170% |
Date | Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||
---|---|---|---|---|---|---|---|---|
Planned | Unplanned | |||||||
Hrs | Hrs | Hrs | % | Hrs | Hrs | % | ||
09/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 07:38 | 35% | 22:00 | 14:22 | 65% |
10/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 03:20 | 15% | 22:00 | 18:40 | 85% |
10/05/2022 | NMB4A - Main Lot | 12:00 | 02:20 | 03:00 | 31% | 09:40 | 06:40 | 69% |
11/05/2022 | BAROSSA GEP | 23:00 | 00:45 | 00:27 | 2% | 22:15 | 21:48 | 98% |
11/05/2022 | NMB4A - Main Lot | 24:00 | 01:20 | 03:40 | 16% | 22:40 | 19:00 | 84% |
12/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 03:18 | 15% | 22:00 | 18:42 | 85% |
12/05/2022 | NMB4A - Main Lot | 32:00 | 00:50 | 06:24 | 21% | 31:10 | 24:46 | 79% |
13/05/2022 | BAROSSA GEP | 23:00 | 01:00 | No data | 22:00 | 22:00 | 100% | |
13/05/2022 | NMB4A - Main Lot | 26:00 | 02:40 | 01:00 | 4% | 23:20 | 22:20 | 96% |
14/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 01:22 | 6% | 22:00 | 20:38 | 94% |
14/05/2022 | NMB4A - Main Lot | 23:00 | 01:05 | 02:10 | 10% | 21:55 | 19:45 | 90% |
16/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 00:48 | 4% | 22:00 | 21:12 | 96% |
16/05/2022 | NMB4A - Main Lot | 23:00 | 01:12 | 00:22 | 2% | 21:48 | 21:26 | 98% |
17/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 01:20 | 6% | 22:00 | 20:40 | 94% |
17/05/2022 | NMB4A - Main Lot | 22:30 | 01:50 | 02:52 | 14% | 20:40 | 17:48 | 86% |
18/05/2022 | BAROSSA GEP | 23:00 | 01:30 | 04:14 | 20% | 21:30 | 17:16 | 80% |
19/05/2022 | BAROSSA GEP | 35:00 | 01:00 | 02:28 | 7% | 34:00 | 31:32 | 93% |
20/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 02:31 | 11% | 22:00 | 19:29 | 89% |
21/05/2022 | BAROSSA GEP | 34:00 | 01:00 | 02:24 | 7% | 33:00 | 30:36 | 93% |
21/05/2022 | NMB4A - Main Lot | 22:00 | 01:30 | 07:47 | 38% | 20:30 | 12:43 | 62% |
23/05/2022 | BAROSSA GEP | 45:00 | 01:00 | 11:26 | 26% | 44:00 | 32:34 | 74% |
23/05/2022 | NMB4A - Main Lot | 22:00 | 01:00 | 04:35 | 22% | 21:00 | 16:25 | 78% |
24/05/2022 | BAROSSA GEP | 35:00 | 01:30 | 15:15 | 46% | 33:30 | 18:15 | 54% |
24/05/2022 | NMB4A - Main Lot | 22:00 | 01:00 | 05:49 | 28% | 21:00 | 15:11 | 72% |
25/05/2022 | BAROSSA GEP | 35:00 | 01:00 | 07:10 | 21% | 34:00 | 26:50 | 79% |
25/05/2022 | NMB4A - Main Lot | 11:00 | 03:29 | No data | 07:31 | 07:31 | 100% | |
26/05/2022 | BAROSSA GEP | 23:00 | 01:00 | 01:32 | 7% | 22:00 | 20:28 | 93% |
27/05/2022 | BAROSSA GEP | 35:00 | 01:00 | 01:43 | 5% | 34:00 | 32:17 | 95% |
27/05/2022 | NMB4A - Main Lot | 41:30 | 00:30 | 06:12 | 15% | 41:00 | 34:48 | 85% |
28/05/2022 | BAROSSA GEP | 23:30 | 01:00 | 10:17 | 46% | 22:30 | 12:13 | 54% |
28/05/2022 | NMB4A - Main Lot | 19:30 | 05:30 | No data | 14:00 | 14:00 | 100% | |
30/05/2022 | BAROSSA GEP | 47:00 | 01:30 | 04:36 | 10% | 45:30 | 40:54 | 90% |
31/05/2022 | BAROSSA GEP | 23:00 | 01:30 | 01:12 | 6% | 21:30 | 20:18 | 94% |
31/05/2022 | SHELL TIMI | 12:00 | No data | No data | 12:00 | 12:00 | 100% | |
878:00 | 46:01 | 126:52 | 15% | 831:59 | 705:07 | 85% |
Date | Project | ACC | REJ | PC | Prd | FTQ |
---|---|---|---|---|---|---|
% | ||||||
09/05/2022 | BAROSSA GEP | 138 | 1 | 0 | 139 | 99% |
10/05/2022 | BAROSSA GEP | 168 | 1 | 0 | 169 | 99% |
10/05/2022 | NMB4A - Main Lot | 6 | 1 | 1 | 8 | 75% |
11/05/2022 | BAROSSA GEP | 188 | 2 | 0 | 190 | 99% |
11/05/2022 | NMB4A - Main Lot | 327 | 2 | 4 | 333 | 98% |
12/05/2022 | BAROSSA GEP | 171 | 1 | 0 | 172 | 99% |
12/05/2022 | NMB4A - Main Lot | 260 | 1 | 6 | 267 | 97% |
13/05/2022 | BAROSSA GEP | 176 | 1 | 0 | 177 | 99% |
13/05/2022 | NMB4A - Main Lot | 328 | 0 | 4 | 332 | 99% |
14/05/2022 | BAROSSA GEP | 185 | 4 | 0 | 189 | 98% |
14/05/2022 | NMB4A - Main Lot | 353 | 0 | 4 | 357 | 99% |
16/05/2022 | BAROSSA GEP | 214 | 3 | 0 | 217 | 99% |
16/05/2022 | NMB4A - Main Lot | 378 | 0 | 4 | 382 | 99% |
17/05/2022 | BAROSSA GEP | 185 | 7 | 0 | 192 | 96% |
17/05/2022 | NMB4A - Main Lot | 325 | 3 | 4 | 332 | 98% |
18/05/2022 | BAROSSA GEP | 160 | 1 | 0 | 161 | 99% |
19/05/2022 | BAROSSA GEP | 195 | 33 | 0 | 228 | 86% |
20/05/2022 | BAROSSA GEP | 184 | 0 | 0 | 184 | 100% |
21/05/2022 | BAROSSA GEP | 203 | 4 | 0 | 207 | 98% |
21/05/2022 | NMB4A - Main Lot | 251 | 0 | 3 | 254 | 99% |
23/05/2022 | BAROSSA GEP | 115 | 4 | 0 | 119 | 97% |
23/05/2022 | NMB4A - Main Lot | 308 | 0 | 6 | 314 | 98% |
24/05/2022 | BAROSSA GEP | 148 | 9 | 0 | 157 | 94% |
24/05/2022 | NMB4A - Main Lot | 313 | 0 | 7 | 320 | 98% |
25/05/2022 | BAROSSA GEP | 170 | 6 | 0 | 176 | 97% |
25/05/2022 | NMB4A - Main Lot | 134 | 0 | 3 | 137 | 98% |
26/05/2022 | BAROSSA GEP | 213 | 1 | 0 | 214 | 100% |
27/05/2022 | BAROSSA GEP | 200 | 7 | 0 | 207 | 97% |
27/05/2022 | NMB4A - Main Lot | 145 | 2 | 2 | 149 | 97% |
28/05/2022 | BAROSSA GEP | 104 | 7 | 0 | 111 | 94% |
28/05/2022 | NMB4A - Main Lot | 36 | 0 | 2 | 38 | 95% |
30/05/2022 | BAROSSA GEP | 191 | 5 | 0 | 196 | 97% |
31/05/2022 | BAROSSA GEP | 215 | 6 | 0 | 221 | 97% |
31/05/2022 | SHELL TIMI | 0 | 17 | 3 | 20 | |
6687 | 129 | 53 | 6869 | 97% |