Project | Av | Pf | FTQ | OEE |
---|---|---|---|---|
% | % | % | % | |
BAROSSA GEP | 75% | 58% | 97% | 77% |
KASAWARI | 85% | 32% | 98% | 72% |
PTTEP SIRIKIT | 100% | 140% | 86% | 109% |
Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||||
---|---|---|---|---|---|---|---|---|---|
Planned | Unplanned | ||||||||
Hrs | Hrs | % | Hrs | % | Hrs | Hrs | % | % | |
BAROSSA GEP | 510.00 | 28.75 | 6% | 125.02 | 25% | 481.25 | 356.23 | 70% | 75% |
KASAWARI | 72.00 | 5.58 | 8% | 10.50 | 15% | 66.42 | 55.92 | 78% | 85% |
PTTEP SIRIKIT | 7.50 | 7.00 | 93% | 0.50 | 0.50 | 7% | 100% | ||
589.50 | 41.33 | 7% | 135.52 | 23% | 548.17 | 412.65 | 70% | 77% |
Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|
% | |||||
BAROSSA GEP | 5070 | 2824 | 101 | 2925 | 58% |
KASAWARI | 1167 | 366 | 1 | 372 | 32% |
PTTEP SIRIKIT | 10 | 12 | 1 | 14 | 140% |
6247 | 3202 | 103 | 3311 | 53% |
Project | ACC | REJ | Prd | FTQ |
---|---|---|---|---|
% | ||||
BAROSSA GEP | 2824 | 101 | 2925 | 97% |
KASAWARI | 366 | 1 | 372 | 98% |
PTTEP SIRIKIT | 12 | 1 | 14 | 86% |
6404 | 206 | 6622 | 97% |
Revenue | MYR | 6,876,307.00 | |
CoPQ | MYR | 942,388.79 | |
CoC | Trial | MYR | 0.00 |
Partly Coated | MYR | 42,927.63 |
Project | Revenue | CoPQ | CoC |
---|---|---|---|
MYR | MYR | MYR | |
BAROSSA GEP | 0.00 | 925,397.93 | 0.00 |
KASAWARI | 0.00 | 8,924.53 | 34,857.46 |
PTTEP SIRIKIT | 0.00 | 8,066.33 | 8,070.17 |
0.00 | 942,388.79 | 42,927.63 |
Project | Year 2022 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Av | 74% | 76% | 70% | |||||||||
Pf | 9% | 51% | 49% | ||||||||||
FTQ | 97% | 90% | 97% | ||||||||||
OEE | 60% | 73% | 72% | ||||||||||
KASAWARI
PROVISION OF LINEPIPE COATING SERVICES FOR KASAWARI GAS DEVELOPMENT PROJECT
|
Av | 85% | 81% | 70% | 78% | ||||||||
Pf | 57% | 37% | 36% | 23% | |||||||||
FTQ | 100% | 99% | 99% | 100% | |||||||||
OEE | 81% | 72% | 69% | 67% | |||||||||
PTTEP SIRIKIT
PTTEP UNDERGROUND LINE SIRIKIT OILFIELD
|
Av | 100% | |||||||||||
Pf | 100% | ||||||||||||
FTQ | 92% | ||||||||||||
OEE | 100% | ||||||||||||
WEST TANK
WEST TANK GROUP DECOMPEXING
|
Av | 15% | |||||||||||
Pf | 100% | ||||||||||||
FTQ | 100% | ||||||||||||
OEE | 72% | ||||||||||||
NMB4A - Main Lot
NORTH MALAY BASIN PHASE 4A MAIN LOT FACILITIES CONTRACT
|
Av | 66% | |||||||||||
Pf | 92% | 55% | |||||||||||
FTQ | 100% | 36% | |||||||||||
OEE | 86% | 29% | |||||||||||
Av | 85% | 79% | 71% | 70% | |||||||||
Pf | 57% | 34% | 41% | 44% | |||||||||
FTQ | 100% | 99% | 95% | 97% | |||||||||
OEE | 81% | 71% | 69% | 70% |
Project | Year 2022 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | ||
BAROSSA GEP
BAROSSA - GAS EXPORT PIPELINE (GEP)
|
Revenue | ||||||||||||
CoPQ | 1,867.03 | 199,184.72 | 925,397.93 | ||||||||||
CoC | 30,635.26 | 2,800.16 | |||||||||||
KASAWARI
PROVISION OF LINEPIPE COATING SERVICES FOR KASAWARI GAS DEVELOPMENT PROJECT
|
Revenue | ||||||||||||
CoPQ | 71,294.57 | 141,462.93 | 80,041.97 | 8,924.53 | |||||||||
CoC | 139,378.32 | 34,857.46 | |||||||||||
PTTEP SIRIKIT
PTTEP UNDERGROUND LINE SIRIKIT OILFIELD
|
Revenue | ||||||||||||
CoPQ | 8,066.33 | ||||||||||||
CoC | 8,070.17 | ||||||||||||
WEST TANK
WEST TANK GROUP DECOMPEXING
|
Revenue | ||||||||||||
CoPQ | |||||||||||||
CoC | 73,133.04 | ||||||||||||
NMB4A - Main Lot
NORTH MALAY BASIN PHASE 4A MAIN LOT FACILITIES CONTRACT
|
Revenue | ||||||||||||
CoPQ | 42,316.62 | ||||||||||||
CoC | 11,429.43 | 5,951.21 | |||||||||||
Revenue | |||||||||||||
CoPQ | 71,294.57 | 143,329.95 | 321,543.30 | 942,388.79 | |||||||||
CoC | 30,635.26 | 14,229.59 | 218,462.57 | 42,927.63 |
Date | Plant | Wrk Hours | Downtime | Prd Hours | Uptime | Availability | |
---|---|---|---|---|---|---|---|
Planned | Unplanned | % | |||||
01/04/2022 | PLANT 2 (Ext) | 12:00 | 00:30 | 02:05 | 11:30 | 09:25 | 82% |
01/04/2022 | PLANT 2 (Int) | 10:00 | 00:30 | 08:00 | 09:30 | 01:30 | 16% |
01/04/2022 | PLANT 3 | 12:00 | No data | No data | 12:00 | 12:00 | 100% |
02/04/2022 | PLANT 2 (Int) | 09:00 | 00:30 | 03:45 | 08:30 | 04:45 | 56% |
04/04/2022 | PLANT 2 (Ext) | 12:00 | 01:00 | No data | 11:00 | 11:00 | 100% |
04/04/2022 | PLANT 2 (Int) | 10:30 | 00:30 | 04:24 | 10:00 | 05:36 | 56% |
04/04/2022 | PLANT 5 | 12:00 | 00:30 | 08:20 | 11:30 | 03:10 | 28% |
05/04/2022 | PLANT 2 (Ext) | 12:00 | 00:30 | 01:40 | 11:30 | 09:50 | 86% |
05/04/2022 | PLANT 2 (Int) | 10:30 | 00:30 | 02:46 | 10:00 | 07:14 | 72% |
06/04/2022 | PLANT 2 (Ext) | 12:00 | 01:00 | 00:45 | 11:00 | 10:15 | 93% |
06/04/2022 | PLANT 2 (Int) | 10:30 | 00:30 | 03:29 | 10:00 | 06:31 | 65% |
07/04/2022 | PLANT 2 (Ext) | 12:00 | 02:35 | 06:00 | 09:25 | 03:25 | 36% |
07/04/2022 | PLANT 2 (Int) | 10:30 | 00:45 | 00:41 | 09:45 | 09:04 | 93% |
08/04/2022 | PLANT 2 (Int) | 20:00 | 00:45 | 02:48 | 19:15 | 16:27 | 85% |
09/04/2022 | PLANT 2 (Int) | 20:00 | 00:45 | 08:02 | 19:15 | 11:13 | 58% |
11/04/2022 | PLANT 2 (Int) | 10:30 | 00:30 | 00:15 | 10:00 | 09:45 | 98% |
12/04/2022 | PLANT 2 (Ext) | 11:00 | 00:15 | 05:25 | 10:45 | 05:20 | 50% |
12/04/2022 | PLANT 2 (Int) | 20:00 | 00:45 | 01:59 | 19:15 | 17:16 | 90% |
13/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 13:08 | 19:00 | 05:52 | 31% |
14/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 02:59 | 19:00 | 16:01 | 84% |
15/04/2022 | PLANT 2 (Int) | 20:00 | 00:45 | 01:23 | 19:15 | 17:52 | 93% |
15/04/2022 | PLANT 5 | 19:30 | 02:30 | 06:20 | 17:00 | 10:40 | 63% |
18/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 06:15 | 19:00 | 12:45 | 67% |
19/04/2022 | PLANT 2 (Ext) | 11:00 | 00:45 | 08:15 | 10:15 | 02:00 | 20% |
19/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 02:26 | 19:00 | 16:34 | 87% |
20/04/2022 | PLANT 2 (Ext) | 11:00 | No data | No data | 11:00 | 11:00 | 100% |
20/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 04:02 | 19:00 | 14:58 | 79% |
21/04/2022 | PLANT 2 (Ext) | 12:00 | 00:30 | 06:00 | 11:30 | 05:30 | 48% |
21/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 02:03 | 19:00 | 16:57 | 89% |
22/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 00:50 | 19:00 | 18:10 | 96% |
23/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 03:06 | 19:00 | 15:54 | 84% |
25/04/2022 | PLANT 2 (Ext) | 11:00 | No data | No data | 11:00 | 11:00 | 100% |
25/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 02:46 | 19:00 | 16:14 | 85% |
26/04/2022 | PLANT 2 (Ext) | 11:00 | 04:30 | No data | 06:30 | 06:30 | 100% |
26/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 05:05 | 19:00 | 13:55 | 73% |
27/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 05:05 | 19:00 | 13:55 | 73% |
28/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 02:59 | 19:00 | 16:01 | 84% |
29/04/2022 | PLANT 2 (Int) | 20:00 | 01:00 | 02:25 | 19:00 | 16:35 | 87% |
30/04/2022 | PLANT 2 (Ext) | 07:30 | 07:00 | No data | 00:30 | 00:30 | 100% |
589:30 | 41:20 | 135:31 | 548:10 | 412:39 | 100% |
Date | Project | Target | ACC | REJ | Prd | Pf |
---|---|---|---|---|---|---|
% | ||||||
01/04/2022 | BAROSSA GEP | 150 | 4 | 0 | 4 | 3% |
01/04/2022 | KASAWARI | 660 | 91 | 1 | 92 | 14% |
02/04/2022 | BAROSSA GEP | 150 | 35 | 1 | 36 | 24% |
04/04/2022 | BAROSSA GEP | 110 | 40 | 8 | 48 | 44% |
04/04/2022 | KASAWARI | 120 | 97 | 0 | 97 | 81% |
05/04/2022 | BAROSSA GEP | 100 | 71 | 0 | 71 | 71% |
05/04/2022 | KASAWARI | 120 | 82 | 0 | 82 | 68% |
06/04/2022 | BAROSSA GEP | 100 | 60 | 0 | 60 | 60% |
06/04/2022 | KASAWARI | 147 | 89 | 0 | 89 | 61% |
07/04/2022 | BAROSSA GEP | 100 | 68 | 1 | 69 | 69% |
07/04/2022 | KASAWARI | 120 | 7 | 0 | 7 | 6% |
08/04/2022 | BAROSSA GEP | 200 | 121 | 0 | 121 | 61% |
09/04/2022 | BAROSSA GEP | 280 | 101 | 1 | 102 | 36% |
11/04/2022 | BAROSSA GEP | 180 | 89 | 0 | 89 | 49% |
12/04/2022 | BAROSSA GEP | 250 | 143 | 8 | 151 | 60% |
13/04/2022 | BAROSSA GEP | 200 | 72 | 2 | 74 | 37% |
14/04/2022 | BAROSSA GEP | 200 | 135 | 0 | 135 | 68% |
15/04/2022 | BAROSSA GEP | 207 | 142 | 2 | 144 | 70% |
18/04/2022 | BAROSSA GEP | 360 | 107 | 10 | 117 | 33% |
19/04/2022 | BAROSSA GEP | 310 | 170 | 9 | 179 | 58% |
20/04/2022 | BAROSSA GEP | 310 | 167 | 0 | 167 | 54% |
21/04/2022 | BAROSSA GEP | 253 | 192 | 18 | 210 | 83% |
22/04/2022 | BAROSSA GEP | 200 | 157 | 0 | 157 | 79% |
23/04/2022 | BAROSSA GEP | 360 | 170 | 1 | 171 | 48% |
25/04/2022 | BAROSSA GEP | 229 | 184 | 21 | 205 | 90% |
26/04/2022 | BAROSSA GEP | 221 | 150 | 11 | 161 | 73% |
27/04/2022 | BAROSSA GEP | 200 | 137 | 5 | 142 | 71% |
28/04/2022 | BAROSSA GEP | 200 | 168 | 1 | 169 | 85% |
29/04/2022 | BAROSSA GEP | 200 | 141 | 2 | 143 | 72% |
30/04/2022 | PTTEP SIRIKIT | 10 | 12 | 1 | 13 | 130% |
Date | Project | Wrk Hours | Downtime | Prd Hours | Uptime | Av | ||
---|---|---|---|---|---|---|---|---|
Planned | Unplanned | |||||||
Hrs | Hrs | Hrs | % | Hrs | Hrs | % | ||
01/04/2022 | BAROSSA GEP | 10:00 | 00:30 | 08:00 | 84% | 09:30 | 01:30 | 16% |
01/04/2022 | KASAWARI | 24:00 | 00:30 | 02:05 | 9% | 23:30 | 21:25 | 91% |
02/04/2022 | BAROSSA GEP | 09:00 | 00:30 | 03:45 | 44% | 08:30 | 04:45 | 56% |
04/04/2022 | BAROSSA GEP | 22:30 | 01:00 | 12:44 | 59% | 21:30 | 08:46 | 41% |
04/04/2022 | KASAWARI | 12:00 | 01:00 | No data | 11:00 | 11:00 | 100% | |
05/04/2022 | BAROSSA GEP | 10:30 | 00:30 | 02:46 | 28% | 10:00 | 07:14 | 72% |
05/04/2022 | KASAWARI | 12:00 | 00:30 | 01:40 | 14% | 11:30 | 09:50 | 86% |
06/04/2022 | BAROSSA GEP | 10:30 | 00:30 | 03:29 | 35% | 10:00 | 06:31 | 65% |
06/04/2022 | KASAWARI | 12:00 | 01:00 | 00:45 | 7% | 11:00 | 10:15 | 93% |
07/04/2022 | BAROSSA GEP | 10:30 | 00:45 | 00:41 | 7% | 09:45 | 09:04 | 93% |
07/04/2022 | KASAWARI | 12:00 | 02:35 | 06:00 | 64% | 09:25 | 03:25 | 36% |
08/04/2022 | BAROSSA GEP | 20:00 | 00:45 | 02:48 | 15% | 19:15 | 16:27 | 85% |
09/04/2022 | BAROSSA GEP | 20:00 | 00:45 | 08:02 | 42% | 19:15 | 11:13 | 58% |
11/04/2022 | BAROSSA GEP | 10:30 | 00:30 | 00:15 | 3% | 10:00 | 09:45 | 98% |
12/04/2022 | BAROSSA GEP | 31:00 | 01:00 | 07:24 | 25% | 30:00 | 22:36 | 75% |
13/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 13:08 | 69% | 19:00 | 05:52 | 31% |
14/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 02:59 | 16% | 19:00 | 16:01 | 84% |
15/04/2022 | BAROSSA GEP | 39:30 | 03:15 | 07:43 | 21% | 36:15 | 28:32 | 79% |
18/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 06:15 | 33% | 19:00 | 12:45 | 67% |
19/04/2022 | BAROSSA GEP | 31:00 | 01:45 | 10:41 | 37% | 29:15 | 18:34 | 63% |
20/04/2022 | BAROSSA GEP | 31:00 | 01:00 | 04:02 | 13% | 30:00 | 25:58 | 87% |
21/04/2022 | BAROSSA GEP | 32:00 | 01:30 | 08:03 | 26% | 30:30 | 22:27 | 74% |
22/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 00:50 | 4% | 19:00 | 18:10 | 96% |
23/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 03:06 | 16% | 19:00 | 15:54 | 84% |
25/04/2022 | BAROSSA GEP | 31:00 | 01:00 | 02:46 | 9% | 30:00 | 27:14 | 91% |
26/04/2022 | BAROSSA GEP | 31:00 | 05:30 | 05:05 | 20% | 25:30 | 20:25 | 80% |
27/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 05:05 | 27% | 19:00 | 13:55 | 73% |
28/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 02:59 | 16% | 19:00 | 16:01 | 84% |
29/04/2022 | BAROSSA GEP | 20:00 | 01:00 | 02:25 | 13% | 19:00 | 16:35 | 87% |
30/04/2022 | PTTEP SIRIKIT | 07:30 | 07:00 | No data | 00:30 | 00:30 | 100% | |
589:30 | 41:20 | 135:31 | 25% | 548:10 | 412:39 | 75% |
Date | Project | ACC | REJ | PC | Prd | FTQ |
---|---|---|---|---|---|---|
% | ||||||
01/04/2022 | BAROSSA GEP | 4 | 0 | 0 | 4 | 100% |
01/04/2022 | KASAWARI | 91 | 1 | 1 | 93 | 98% |
02/04/2022 | BAROSSA GEP | 35 | 1 | 0 | 36 | 97% |
04/04/2022 | BAROSSA GEP | 40 | 8 | 0 | 48 | 83% |
04/04/2022 | KASAWARI | 97 | 0 | 1 | 98 | 99% |
05/04/2022 | BAROSSA GEP | 71 | 0 | 0 | 71 | 100% |
05/04/2022 | KASAWARI | 82 | 0 | 1 | 83 | 99% |
06/04/2022 | BAROSSA GEP | 60 | 0 | 0 | 60 | 100% |
06/04/2022 | KASAWARI | 89 | 0 | 1 | 90 | 99% |
07/04/2022 | BAROSSA GEP | 68 | 1 | 0 | 69 | 99% |
07/04/2022 | KASAWARI | 7 | 0 | 1 | 8 | 88% |
08/04/2022 | BAROSSA GEP | 121 | 0 | 0 | 121 | 100% |
09/04/2022 | BAROSSA GEP | 101 | 1 | 0 | 102 | 99% |
11/04/2022 | BAROSSA GEP | 89 | 0 | 0 | 89 | 100% |
12/04/2022 | BAROSSA GEP | 143 | 8 | 0 | 151 | 95% |
13/04/2022 | BAROSSA GEP | 72 | 2 | 0 | 74 | 97% |
14/04/2022 | BAROSSA GEP | 135 | 0 | 0 | 135 | 100% |
15/04/2022 | BAROSSA GEP | 142 | 2 | 0 | 144 | 99% |
18/04/2022 | BAROSSA GEP | 107 | 10 | 0 | 117 | 91% |
19/04/2022 | BAROSSA GEP | 170 | 9 | 0 | 179 | 95% |
20/04/2022 | BAROSSA GEP | 167 | 0 | 0 | 167 | 100% |
21/04/2022 | BAROSSA GEP | 192 | 18 | 0 | 210 | 91% |
22/04/2022 | BAROSSA GEP | 157 | 0 | 0 | 157 | 100% |
23/04/2022 | BAROSSA GEP | 170 | 1 | 0 | 171 | 99% |
25/04/2022 | BAROSSA GEP | 184 | 21 | 0 | 205 | 90% |
26/04/2022 | BAROSSA GEP | 150 | 11 | 0 | 161 | 93% |
27/04/2022 | BAROSSA GEP | 137 | 5 | 0 | 142 | 96% |
28/04/2022 | BAROSSA GEP | 168 | 1 | 0 | 169 | 99% |
29/04/2022 | BAROSSA GEP | 141 | 2 | 0 | 143 | 99% |
30/04/2022 | PTTEP SIRIKIT | 12 | 1 | 1 | 14 | 86% |
3202 | 103 | 6 | 3311 | 97% |